Skip to content
01223 910750info@synergyelectricals.co.uk
01223 910750
Menu

SERVICES

FUSE BOARD UPGRADES

Your old fuse board, swapped for a modern consumer unit.

RCD protection on every circuit, tested on the day, and the certificate in your hand before we leave.

WHAT YOU GET

What a modern board actually does

An old board protects the wiring. A modern consumer unit protects the wiring and the person touching it, because every circuit sits behind an RCD that trips in milliseconds.

The change means testing every circuit in the house on the day, which is why the job comes with a full schedule of results rather than just a new box on the wall.

GET A PRICE FOR THIS

Roughly what are you after?

Pick the closest one, it saves you describing the whole thing twice. Then tell us the rest here, rather than on another page.

Roughly what are you after

Whichever you would rather we use. One is enough.

Goes straight to info@synergyelectricals.co.uk. Every job gets a written quote.

HOW IT WORKS

Six steps, and a certificate at the end of them.

  1. STEP 01

    Free quote, in writing

    Tell us roughly what needs doing. A short description is plenty to start with.

  2. STEP 02

    Designed to BS 7671

    The installation is designed against the 18th Edition wiring regulations before anyone picks up a tool.

  3. STEP 03

    Installed by our own engineers

    Qualified and NICEIC approved. No subcontracted unknowns turning up at your door.

  4. STEP 04

    Inspected and tested

    Full inspection and test to BS 7671, with every result recorded rather than ticked off.

  5. STEP 05

    Certificate in your hand

    An Electrical Installation Certificate or Minor Works Certificate, issued by us.

  6. STEP 06

    Building Control notified

    Notifiable domestic work notified under Part P, on our own Domestic Installer registration.

CERTIFICATION

What a certified installation includes.

What is included with a certified electrical installation, compared with an uncertified one
CERTIFIEDUNCERTIFIED
Full inspection and test to BS 7671, with the results recorded
An Electrical Installation Certificate or Minor Works Certificate in your hand
Building Control notified for notifiable domestic work, under Part P
The installer's actual work assessed by NICEIC, not just their paperwork
A registered contractor answerable to a scheme if something is wrong

Ask any electrician for the certificate before the job starts. If the answer is vague, so is the testing.

OR JUST RING US

Easier to explain out loud?

Ring the office and talk it through with somebody who does the work. The mobiles are answered any hour if it will not wait.

Call 01223 910750Free Quote